A loader filling in a pebble-finish pool in a desert backyard

Pool removal in Nevada

Pool removal in Nevada starts with a local permit and an 811 call before digging; then a crew paid Nevada rates fills the pool in or takes it out.

Concrete pool, filled in · 1–3 days
$2,600–$10,300
Concrete pool, taken out · 3–7 days
$4,100–$16,500

US ranges from Angi, set for Nevada construction pay (BLS, May 2025); days from HomeAdvisor.

Pool removal cost calculator

Prices are US averages.

What kind of pool is it?

Not sure? Touch the wall: soft and pressable is vinyl, slick and glossy is fiberglass, rough is concrete.

Your pool removal price in Nevada mostly depends on two things: what your pool is made of, and whether you fill it in or take it all the way out. In Clark County, demolishing a pool generally requires a permit, and Nevada also requires advance notice before excavation or demolition. One call connects you with a pool demolition company that works in your area. The crew asks about your pool and yard, books a visit, and gives you a written price.

What does each kind of pool cost?

The numbers below come from national figures published by Angi, then adjusted using Nevada construction laborer pay. That average wage is $25.98 per hour, based on data from the Bureau of Labor Statistics.

Pool typeNevada price range
Above-ground pool, dismantled and hauled off$500 to $2,575
Vinyl liner pool, removed$3,100 to $10,300
Fiberglass pool, removed$5,200 to $15,500
Concrete or gunite pool, filled in$2,600 to $10,300
Concrete or gunite pool, fully removed$4,100 to $16,500

Taking the whole pool out is more work, so it costs more and takes longer. Where your job lands in these ranges depends on your yard, so a visit from a crew gets you a written price for your pool.

Clark County pool demolition permits

Around Las Vegas, the Building Administrative Code from Clark County says a demolition permit is needed to demolish a pool or spa. If building something wouldn't have required a permit, demolishing it doesn't either.

A final inspection is part of the permit too. If the area inspection supervisor thinks more inspections are warranted, they can require them.

The 811 call before digging

Under Nevada law, anyone digging or demolishing has to let the one-call association know no fewer than 2 working days before the job begins, and no earlier than 28 calendar days out. The rule appears in NRS chapter 455.

USA North 811 tells diggers to outline the work area clearly before calling 811. That's the process that gets underground utility lines found before a shovel hits the ground.

Hiring a licensed contractor

Nevada law makes it illegal to do contracting work, or even bid on a job, without a current contractor's license. The handyman exemption only applies to repairs or upkeep costing less than $1,000 with labor and materials together, and it never covers jobs that need a building permit. It's a good idea to ask any crew you talk to for proof they're licensed.

Getting rid of pool water in Las Vegas

According to the Las Vegas Valley Water District, pool water has to drain straight into the sanitary sewer, where it can be recycled and reused. The district recommends staying at or under 12 gallons per minute. Should water start backing up, stop draining and get a plumber on the phone.

How long will the crew be in your yard?

HomeAdvisor reports that filling in a pool takes 1 to 3 days. A complete removal runs about 3 to 7 days.

Selling your home once the pool is gone

The Seller's Real Property Disclosure Form used in Nevada asks whether the property has ever had foundation trouble, such as sliding, settling, shifting, upheaval, or other soil stability issues. If you might sell someday, a filled pool can raise soil questions on this form, so mention it when you call and ask how the crew will leave your yard.

Get a written price for your yard

Call now to get your pool's price pinned down for your own yard instead of a wide range. The crew will ask about your pool and yard, book a visit, and give you a written price.

Get a crew to look at your yard

The ranges tell you what is usual. Once a crew sees your pool, the access, and the fill, they will give you a real written quote.