A track loader dumping fill dirt into a broken-out in-ground pool

Pool removal in Oregon

Pool removal in Oregon starts with a local permit and an 811 call before digging; then a crew paid Oregon rates fills the pool in or takes it out.

Concrete pool, filled in · 1–3 days
$2,600–$10,600
Concrete pool, taken out · 3–7 days
$4,200–$16,900

US ranges from Angi, set for Oregon construction pay (BLS, May 2025); days from HomeAdvisor.

Pool removal cost calculator

Prices are US averages.

What kind of pool is it?

Not sure? Touch the wall: soft and pressable is vinyl, slick and glossy is fiberglass, rough is concrete.

Pool removal in Oregon costs about $500 for an above ground pool and can reach $16,900 to pull a concrete pool all the way out.

The price depends on your pool and your yard, so the quickest way to know yours is a written price from a crew that has seen it. Call now to reach a pool demolition company that serves your area. They'll ask about your pool and yard, book a visit, and give you a written price.

Other pool types and prices

These ranges come from national numbers published by Angi, adjusted to reflect Oregon construction laborer pay, which averages $26.79 an hour, according to the Bureau of Labor Statistics.

Pool typeOregon price range
Above ground, dismantled and hauled off$500 to $2,650
Vinyl liner, removed$3,200 to $10,600
Fiberglass, removed$5,300 to $15,900

Filling in the pool costs less and takes 1 to 3 days. Taking the whole pool out costs more and takes 3 to 7 days. Tell the crew which you prefer and they'll price both. Those site-visit estimates are drawn from HomeAdvisor.

Before you dig

State rules require excavators to contact the Oregon Utility Notification Center no fewer than 2 full business days, and no more than 10, ahead of any excavation. Your crew normally handles this, and you can ask them to confirm it.

An owner or tenant digging on their own private property is exempt if the hole is under 12 inches deep and not within an established easement.

Choosing a licensed crew

In Oregon, the law generally says anyone who gets paid for construction work that improves real property needs a Construction Contractors Board license. Before you settle on a price, ask the crew for their license number.

What happens to the pool water?

Portland's city guidance says pool water should go to the sanitary sewer, or soak into the ground if that's workable. Draining a home pool into the sanitary sewer doesn't call for any prior written authorization.

When the storm system is the only option left, the water needs dechlorinating first. You do that by letting it stand for two weeks or more, until a test kit reads at or under 0.1 mg/l of total residual chlorine.

Filling the hole in Portland

Once demolition is done, Portland requires that the site be brought back to a state fit for building on. If demolition leaves replacement fill 24 inches deep or more, Portland requires that fill to be compacted. The rule covers demolition in general and does not mention pools.

In a 2019 appeal, a homeowner said Portland officials required them to break up and remove the bottom and walls of their concrete pool, then fill the hole with soil. That's one homeowner's account, not a published city rule, but it shows Portland can ask for more than you might expect. It's one more reason to work with a local crew. They'll ask about your pool and yard and plan the job around what's needed.

  • Pool fill in: fill dirt going into a broken-out concrete pool

    Fill it in

    $2,600–$10,600 in Oregon

    Time in the yard
    1–3 days
    Build there later?
    Usually not
    Tell a buyer?
    Yes: the bottom of the pool stays buried. Show the permit and the compaction report.
    Pool fill in, step by step
  • Full pool removal: a dump truck loaded with the broken pool shell beside the empty hole

    Take it all out

    $4,200–$16,900 in Oregon

    Time in the yard
    3–7 days
    Build there later?
    Usually, once the town approves the packed fill
    Tell a buyer?
    Show the permit and the compaction report.
    Full removal prices

Fill and your home sale

The Oregon seller's property disclosure statement asks about settling, soil, standing water or drainage issues affecting the property or nearby, and whether any fill sits on the land. A filled-in pool can come up at sale time, so hang on to your records.

Getting a written price

A single call connects you with a pool demolition company serving your area. They'll ask about your pool and yard, set up a visit, and then hand you a price in writing. Call now to get yours.

Get a crew to look at your yard

The ranges tell you what is usual. Once a crew sees your pool, the access, and the fill, they will give you a real written quote.