A track loader dumping fill dirt into a broken-out in-ground pool

Pool removal in Idaho

Pool removal in Idaho starts with a local permit and an 811 call before digging; then a crew paid Idaho rates fills the pool in or takes it out.

Concrete pool, filled in · 1–3 days
$2,400–$9,500
Concrete pool, taken out · 3–7 days
$3,800–$15,100

US ranges from Angi, set for Idaho construction pay (BLS, May 2025); days from HomeAdvisor.

Pool removal cost calculator

Prices are US averages.

What kind of pool is it?

Not sure? Touch the wall: soft and pressable is vinyl, slick and glossy is fiberglass, rough is concrete.

Most Idaho pool removals cost somewhere between a few hundred dollars for an above ground pool and around $15,000 to take out a big concrete one.

Your price depends on what your pool is made of and whether you fill it in or take it all out. A single call connects you with a pool demolition company that serves your area.

Prices by pool type

The figures start from national Angi prices and are then tuned to Idaho pay levels. The BLS puts average pay for construction laborers here at $23.38 an hour.

Pool typeIdaho cost range
Above ground, dismantled and hauled off$450 to $2,375
Vinyl liner removal$2,800 to $9,500
Fiberglass removal$4,700 to $14,200
Gunite or concrete pool, filled in$2,400 to $9,500
Concrete or gunite, fully removed$3,800 to $15,100

For a concrete or gunite pool, a fill-in generally costs less than taking the whole pool out. Taking the whole pool out costs more and keeps the crew in your yard longer. When you call, they'll ask about your pool and yard, book a visit, and give you a written price for your pool.

Pool removal permits in Boise

The city of Boise handles pool removal through a general demolition application rather than a form made just for pools. Boise's demolition application requires a bond for site cleanup and stabilization, and the building inspector sets the amount. Liability insurance naming the city is also needed, and fees are only collected once the bond is in place.

Boise also requires an erosion control review, permit and fees for any job that disturbs 2 cubic yards of soil or more, and pools are on that list.

Calling before you dig

Under Idaho law, anyone excavating must notify the one-number notification service between 2 and 10 business days before digging begins. That way, underground utility lines get marked before any work begins.

Idaho's Guide to Safe Digging says utilities have two full business days to respond, and the day you call, weekends, and holidays don't count. Keep that waiting period in mind when you pick a start date.

Draining the water first

Meridian rules say chlorinated or brominated pool water may not enter the public sewer or a storm drain unless it's neutralized and approved first. You can drain onto your own lawn, as long as the water stays within your property.

The Ada County Highway District recommends letting pool water soak into landscaping only after the chlorine level reaches zero.

Hiring a registered contractor

Idaho law makes working as a contractor without registration unlawful. Small, minor jobs under $2,000 for labor and materials can be exempt, but not if they're part of a bigger project or split up to dodge the rule. Most pool removals cost more than $2,000, so the company you hire needs to be registered in Idaho.

Selling your home once the pool is gone

On Idaho's property condition disclosure form, sellers list any issues, beginning with basement water and the foundation. If you sell later, keep your removal paperwork somewhere safe.

Ready to get your yard back?

Call now and you'll reach a pool demolition company serving your area. They'll ask about your pool and yard, book a visit, and give you a written price. The utility notice before digging takes a few business days, so a call today gets your start date moving.

Get a crew to look at your yard

The ranges tell you what is usual. Once a crew sees your pool, the access, and the fill, they will give you a real written quote.