Pool removal in Rhode Island

Pool removal in Rhode Island starts with a local permit and an 811 call before digging; then a crew paid Rhode Island rates fills the pool in or takes it out.

Concrete pool, filled in · 1–3 days
$2,900–$11,500
Concrete pool, taken out · 3–7 days
$4,600–$18,500

US ranges from Angi, set for Rhode Island construction pay (BLS, May 2025); days from HomeAdvisor.

Pool removal cost calculator

Prices are US averages.

What kind of pool is it?

Not sure? Touch the wall: soft and pressable is vinyl, slick and glossy is fiberglass, rough is concrete.

Pool removal in Rhode Island usually costs $2,900 to $11,500 for filling in a concrete pool, and your town has to issue a permit before any work starts.

Call now to reach a pool demolition company that serves your area.

What does removal cost by pool type?

These prices start from national figures from Angi and are raised a little for Rhode Island, because construction laborers here earn more than the national average (BLS).

Type of poolTypical Rhode Island cost
Above ground pool, dismantled and hauled off$550 to $2,875
Concrete or gunite, filled in place$2,900 to $11,500
Concrete or gunite, fully removed$4,600 to $18,500
Fiberglass, removed$5,800 to $17,300
Vinyl liner, removed$3,500 to $11,500

Filling in a pool leaves part of it in place. With a full removal, every part of the pool comes out. A fill in usually takes 1 to 3 days on site, while taking the pool all the way out takes 3 to 7 days, per HomeAdvisor.

Every yard is a little different, so the crew visits and gives you a written price. One call sets that up.

Permits for taking out a pool

Rhode Island requires a permit before any pool demolition starts (state law). The permit comes from your city or town.

Providence tells property owners not to start any work, demolition included, without a permit, and the inspections you need are set at the time the permit is issued (Providence).

A demolition permit in Cranston costs $110 (Cranston code). Cranston also calls for an inspection before demolition begins and one more after all demolition and filling is done, each with at least 24 hours' notice (Cranston permit packet).

Permit and inspection requirements vary by city or town, so ask about them when the crew visits.

Filling the site afterward

When no new structure is planned, state law says the lot must be filled with nonorganic fill. The ground has to be graded level with the land around it and kept free of standing water and anything that could hurt someone (state law).

  • Pool fill in: fill dirt going into a broken-out concrete pool

    Fill it in

    $2,900–$11,500 in Rhode Island

    Time in the yard
    1–3 days
    Build there later?
    Usually not
    Tell a buyer?
    Yes: the bottom of the pool stays buried. Show the permit and the compaction report.
    Pool fill in, step by step
  • Full pool removal: a dump truck loaded with the broken pool shell beside the empty hole

    Take it all out

    $4,600–$18,500 in Rhode Island

    Time in the yard
    3–7 days
    Build there later?
    Usually, once the town approves the packed fill
    Tell a buyer?
    Show the permit and the compaction report.
    Full removal prices

Calling before you dig

If you dig within 100 feet of a utility line, you have to give Dig Safe notice no less than 72 hours ahead, and weekends and holidays don't count toward that time. The notice can be given up to 30 days before the work, and the digging has to begin within that 30 day window (state law).

Hiring a registered contractor

Contractors doing residential construction work in Rhode Island must be registered with the Contractors' Registration and Licensing Board. If you live in the home and do the work yourself, you don't have to register.

State law also prohibits anyone from performing, offering, or bidding on contractor work unless they hold a current registration certificate (state law). Before you accept a bid, ask the crew for their registration.

Draining the pool water

Under Rhode Island's stormwater rules (RIDEM), dechlorinated pool water is one of the flows a town may allow into its storm sewers. That means the chlorine should be removed from the water before it enters a storm drain.

Get a crew to look at your yard

Call now and you'll reach a pool demolition company that works in your area. They'll ask about your pool and yard, book a visit, and give you a written price.

Get a crew to look at your yard

The ranges tell you what is usual. Once a crew sees your pool, the access, and the fill, they will give you a real written quote.