Pool removal in Nebraska starts with a local permit and an 811 call before digging; then a crew paid Nebraska rates fills the pool in or takes it out.

Concrete pool, filled in · 1–3 days
$2,400–$9,400
Concrete pool, taken out · 3–7 days
$3,800–$15,100

US ranges from Angi, set for Nebraska construction pay (BLS, May 2025); days from HomeAdvisor.

Pool removal cost calculator

Prices are US averages.

What kind of pool is it?

Not sure? Touch the wall: soft and pressable is vinyl, slick and glossy is fiberglass, rough is concrete.

Most Nebraska pool removals cost between $2,400 and $15,100 for an in-ground pool, and less for an above ground one.

Call now to reach a pool demolition company that works in your area, and get a written price for your own yard.

Cost by pool type

The starting point for these ranges is Angi's 2026 national prices. We've adjusted them for Nebraska, where crew wages run a little below the national average, so prices here tend to come in slightly lower.

PoolEstimated Nebraska cost
Above ground, dismantled and hauled off$450 to $2,350
Vinyl liner, removed$2,800 to $9,400
Fiberglass, removed$4,700 to $14,100
Concrete/gunite, filled in place$2,400 to $9,400
Concrete/gunite, fully removed$3,800 to $15,100

Filling in a concrete pool is the cheaper route, and the crew is usually done in a few days. Taking it all the way out costs more, but nothing is left buried under your yard. Want to know what yours will cost? Call now. The crew asks about your pool and yard, books a visit, and gives you a written price.

Permits for pool removal in Lincoln

Under Lincoln's building code, a building permit is needed before a swimming pool gets removed or demolished. That rule covers the city itself plus three miles beyond its limits, which means some homes past the city line fall under it as well.

Once the work is finished, the demolition rules say the applicant has to clear away all debris and ask for an inspection. Then the hole gets filled and graded with topsoil or another approved material.

Calling 811 before digging

State law says you must notify the one-call center a minimum of two full business days, and at most ten business days, ahead of any digging. That window gives time for utility lines to be marked so no one strikes them.

Those markings don't last forever. A Nebraska 811 ticket stays good for 17 calendar days, so if digging runs longer than that, or the marks get wiped out or hard to read, a refresh ticket is required.

Choosing a registered contractor

The state says contractors and subcontractors must sign up with the Nebraska Department of Labor. This applies to anyone performing or arranging work on property they don't own. It's a state registration, not a trade license, and any crew you hire for your yard should have it.

How long the work takes at your home

According to HomeAdvisor, a fill in runs 1 to 3 days. A full removal of the pool runs 3 to 7 days.

Selling your home once the pool is gone

Nebraska's Seller Property Condition Disclosure Statement asks whether the foundation, floors, walls, sidewalk, patio, or driveway have moved or settled. If you sell someday, a properly filled and graded yard helps you answer that question with confidence.

Get a crew to see your yard

Call now to reach a pool demolition company that works in your area. The crew will ask about your pool and yard, book a visit, and give you a written price.

Get a crew to look at your yard

The ranges tell you what is usual. Once a crew sees your pool, the access, and the fill, they will give you a real written quote.