Pool removal in Texas

Pool removal in Texas starts with a local permit and an 811 call before digging; then a crew paid Texas rates fills the pool in or takes it out.

Concrete pool, filled in · 1–3 days
$2,100–$8,600
Concrete pool, taken out · 3–7 days
$3,400–$13,700

US ranges from Angi, set for Texas construction pay (BLS, May 2025); days from HomeAdvisor.

Pool removal cost calculator

Prices are US averages.

What kind of pool is it?

Not sure? Touch the wall: soft and pressable is vinyl, slick and glossy is fiberglass, rough is concrete.

Ready to find out what pool removal in Texas would cost? Call now to reach a pool demolition company that serves your area. The crew will ask about your pool and yard, book a visit, and give you a written price. State law says you must call 811 at least 2 business days before any digging starts, and some cities, Houston among them, also ask for permits ahead of time.

Pool removal prices in Texas by type

Labor makes up most of what you pay for pool removal. In Texas, construction laborers average $20.63 an hour, while the figure for the whole US is $25.02. That gap is the reason Texas pricing runs lower.

Pool typeHow it is handledTexas price
Above groundTaken apart and hauled off$400 to $2,150
Concrete or guniteFilled with soil$2,100 to $8,600
Concrete or guniteDug out completely$3,400 to $13,700
FiberglassPulled out$4,300 to $12,800
Vinyl linerRemoved$2,600 to $8,600

These numbers come from Angi's US prices, adjusted to reflect Texas wages. Your real figure comes from a crew after it has looked at your pool, how it can get into your yard, and how much fill the job calls for.

Fill-in versus full removal for a concrete pool

With a fill-in, the crew breaks open part of the shell, leaves the remainder buried, and packs the hole with soil. Work like this usually keeps a crew on site for 1 to 3 days. A full removal takes everything out and runs 3 to 7 days.

Filling in costs less. Taking it all out leaves nothing buried, which can matter if you plan to build there or sell. Texas sellers complete the Seller's Disclosure Notice, and one question on it covers whether the seller knows about landfill, settling, or soil movement at the property. A local crew can help you pick the option that fits your yard and what you have planned.

  • Pool fill in: fill dirt going into a broken-out concrete pool

    Fill it in

    $2,100–$8,600 in Texas

    Time in the yard
    1–3 days
    Build there later?
    Usually not
    Tell a buyer?
    Yes: the bottom of the pool stays buried. Show the permit and the compaction report.
    Pool fill in, step by step
  • Full pool removal: a dump truck loaded with the broken pool shell beside the empty hole

    Take it all out

    $3,400–$13,700 in Texas

    Time in the yard
    3–7 days
    Build there later?
    Usually, once the town approves the packed fill
    Tell a buyer?
    Show the permit and the compaction report.
    Full removal prices

Calling 811 before any digging

Under Texas law you have to reach 811 at least two business days ahead of any digging, and weekends and holidays don't count toward those days. This holds true even for a job in your own backyard. The call leads to buried utility lines getting marked so the crew avoids them.

Permits in Houston

Houston requires its permits in a fixed sequence. First, Houston requires a sanitary sewer disconnect permit. Next comes the demolition, fill, and grading permit for a pool or spa, which calls for Form CE-1094, a worksheet covering the excavation and the fill.

The city's specification also spells out how the work gets done:

  • 3-inch holes get made through the lowest part of the pool floor, spaced roughly 4 feet apart in each direction, so water can drain.
  • The hole gets backfilled with a loose, gravel-like fill placed in even 12-inch layers.
  • Houston also sets rules for how firmly the fill must be packed, and your crew will handle that.
  • Pool water can't be let out anywhere it might cause flooding or erosion, or carry soil toward ditches, streams, or storm water nearby. Draining it into a storm sewer is also off limits.

A crew familiar with these Houston rules can build the job plan around them starting with the first visit.

San Antonio's licensing rule

San Antonio's permit application has a demolition section that calls for a city licensed demolition contractor. Without one, that part of the permit can't be approved, so the license is worth checking before you sign anyone on.

State licensing for pool demolition in Texas

Texas doesn't license or bond general contractors at the state level, though they do have to be registered as a business with the state. The agency that used to register home builders, the Texas Residential Construction Commission, no longer exists and now shows as inactive.

Licensing rules, where they exist, are set by your city, so the local building department is the one that decides them. One call reaches a local pool demolition crew. They'll ask about your pool and yard, then book a visit and give you a price in writing.

How to get a written quote

  1. Call now. One call reaches a local pool demolition company near you.
  2. Describe your pool type and your yard to the crew. This helps them get the visit ready.
  3. They set up a visit, see the pool in person, and hand you a price in writing.

Having the price in writing lets you check it against the Texas range before you commit. Call now to set up the visit.

Get a crew to look at your yard

The ranges tell you what is usual. Once a crew sees your pool, the access, and the fill, they will give you a real written quote.