An excavator breaking out an old concrete pool behind a colonial house

Pool removal in Ohio

Pool removal in Ohio starts with a local permit and an 811 call before digging; then a crew paid Ohio rates fills the pool in or takes it out.

Concrete pool, filled in · 1–3 days
$2,700–$11,000
Concrete pool, taken out · 3–7 days
$4,400–$17,600

US ranges from Angi, set for Ohio construction pay (BLS, May 2025); days from HomeAdvisor.

Pool removal cost calculator

Prices are US averages.

What kind of pool is it?

Not sure? Touch the wall: soft and pressable is vinyl, slick and glossy is fiberglass, rough is concrete.

What you'll pay for pool removal in Ohio depends on the kind of pool you have and whether you fill it in or take it all out. Call now to reach a pool demolition company that works in your area. The crew will ask about your pool and yard, book a visit, and give you a written price. Filling in a concrete pool usually costs $2,700 to $11,000 and wraps up in about 1 to 3 days Having a concrete pool removed entirely runs $4,400 to $17,600 and takes closer to 3 to 7 days

What does it cost to remove different pools?

The ranges below come from national data published by Angi, adjusted for Ohio, where average pay for construction laborers is $28.03 per hour versus $25.02 nationwide (BLS).

Kind of poolOhio price range
Above ground, dismantled and hauled off$525 to $2,750
Vinyl liner, removed$3,300 to $11,000
Fiberglass, removed$5,500 to $16,500

If you have a concrete or gunite pool, filling it in costs less than taking it all the way out.

Partial fill versus full removal

Filling in a concrete pool leaves some of the structure in place, while a full removal takes the whole pool out. Per HomeAdvisor, plan on the crew being there 1 to 3 days for a partial fill, or 3 to 7 days when everything comes out.

  • Pool fill in: fill dirt going into a broken-out concrete pool

    Fill it in

    $2,700–$11,000 in Ohio

    Time in the yard
    1–3 days
    Build there later?
    Usually not
    Tell a buyer?
    Yes: the bottom of the pool stays buried. Show the permit and the compaction report.
    Pool fill in, step by step
  • Full pool removal: a dump truck loaded with the broken pool shell beside the empty hole

    Take it all out

    $4,400–$17,600 in Ohio

    Time in the yard
    3–7 days
    Build there later?
    Usually, once the town approves the packed fill
    Tell a buyer?
    Show the permit and the compaction report.
    Full removal prices

Permits for pool removal in Ohio

Your city or village sets the permit rules, not the state. Take Montgomery: filling in an in-ground pool there calls for zoning approval rather than a full building permit.

The Montgomery application also notes the city can ask for a right-of-way improvement bond plus City Engineer review when the final grade will change, and ground cover has to be down within 7 days of the job being done.

Columbus issues demolition permits to pros who are registered with the city's Building and Zoning Services office. Columbus lets homeowners get permits for certain work they do themselves, including demolition of an accessory structure, but not for work a hired contractor will do, per the city's FAQ. That page doesn't mention pools by name, so this is a good question to ask the crew when you call.

Call now to reach a pool demolition company that works in your area.

Calling 811 before digging

Ohio law says whoever digs must call the state's 811 line at least two working days before digging, not counting the day of the call, and no more than 16 calendar days before (Ohio law).

Hire an excavator and following the rule is their job. Dig on your own and it doesn't apply, unless the digging happens within a utility easement or public right-of-way, or where utility lines are known to serve the property.

Choosing a contractor

At the state level, Ohio licenses only commercial contractors in electrical, HVAC, plumbing, hydronics and refrigeration work. Local building and health departments oversee residential contractors, per the Ohio Construction Industry Licensing Board. When you call, the crew will book a visit and give you a written price for your job.

Draining the pool water

Per Ohio EPA rules, dechlorinated pool water can be discharged to a storm sewer as long as it doesn't add significant pollutants. The agency suggests letting the water sit, usually 48 hours or longer, so the chlorine dissipates before release. You can read more in the Ohio EPA's guidance.

If you sell the house later

The Ohio Residential Property Disclosure Form asks sellers if they're aware of any past or present flooding, drainage, settling, grading or erosion issues. When you pick how the pool comes out, keep that question in mind if a sale is in your future.

Get a written price for your pool

These ranges tell you what's typical, and a visit is what turns them into an actual number. Call now, and the crew will ask about your pool and yard, then book a visit and give you a price in writing.

Get a crew to look at your yard

The ranges tell you what is usual. Once a crew sees your pool, the access, and the fill, they will give you a real written quote.