Pool removal in North Carolina
Pool removal in North Carolina starts with a local permit and an 811 call before digging; then a crew paid North Carolina rates fills the pool in or takes it out.
- Concrete pool, filled in · 1–3 days
- $2,200–$8,900
- Concrete pool, taken out · 3–7 days
- $3,600–$14,300
US ranges from Angi, set for North Carolina construction pay (BLS, May 2025); days from HomeAdvisor.
Pool removal cost calculator
What kind of pool is it?
Not sure? Touch the wall: soft and pressable is vinyl, slick and glossy is fiberglass, rough is concrete.
Last question
Fill it in, or take it all out?
Pool removal in North Carolina usually runs a bit under the national average, because crew pay here is lower. Call now and a local pool demolition company will book a visit and give you a written price.
Prices by kind of pool
What kind of pool sits in your yard shapes the cost more than anything else. With a concrete or gunite pool, the price also hinges on whether it's filled in or fully removed. These prices group concrete and gunite pools together.
| Pool type | Work involved | Cost in this state |
|---|---|---|
| Above ground | Taken apart and hauled away | $425 to $2,225 |
| Vinyl liner | Removal | $2,700 to $8,900 |
| Fiberglass | Removal | $4,500 to $13,400 |
| Concrete/gunite | Fill-in | $2,200 to $8,900 |
| Concrete/gunite | Full removal | $3,600 to $14,300 |
These figures begin with national numbers from Angi, then get adjusted for local wages. Construction laborers in this state average $21.76 an hour, compared with $25.02 nationwide, per the Bureau of Labor Statistics. The exact spot your job occupies in that spread comes down to the pool itself and the yard around it, which a crew can size up once they visit.
Fill-in versus full removal
The cheaper, quicker route is filling in a concrete pool. Expect the crew to be on site for 1 to 3 days. A full removal runs longer, usually 3 to 7 days, based on HomeAdvisor.
Your pick can come up again when you sell the house. The state's mandatory seller disclosure form asks if the property has any issues involving drainage, grading, or soil stability. Tell the crew what you want from the yard, and they'll point you to the route that fits.

Fill it in
$2,200–$8,900 in North Carolina
- Time in the yard
- 1–3 days
- Build there later?
- Usually not
- Tell a buyer?
- Yes: the bottom of the pool stays buried. Show the permit and the compaction report.

Take it all out
$3,600–$14,300 in North Carolina
- Time in the yard
- 3–7 days
- Build there later?
- Usually, once the town approves the packed fill
- Tell a buyer?
- Show the permit and the compaction report.
Calling 811 before any digging
State law says you must give the 811 center notice no later than 3 full working days ahead of any excavation or demolition, per G.S. 87-122. That window lets utility companies come out and mark the lines buried in your yard.
Once issued, an 811 ticket runs from the work start date and covers digging for up to 28 calendar days, according to NC 811.
Permits in Raleigh
Raleigh counts removing an existing structure as demolition, which means a residential permit is needed. The city also points out that stormwater buffers or tree protection could come into play.
To apply, the city requires a site plan or survey. That drawing needs to show each structure coming out, the ground that will be disturbed, and whatever is staying put. A correct plan keeps the permit moving, and a local crew can say what your particular yard calls for.
Draining a pool in Charlotte
Charlotte Water lets pool water enter a storm drain only when chlorine reads under 0.1 mg/L. Reaching that level means either leaving the water untouched for a week with no chlorine added, or treating it with a dechlorinating additive. Testing the chlorine is required before any water is released.
Does the crew need a state license?
North Carolina requires a general contractor to hold a state license once a project's total cost hits $40,000 or more, per the NC Licensing Board for General Contractors. That threshold has applied to building, grading, and similar improvements since October 1, 2023, while jobs costing less than $40,000 are exempt.
Each range in the price table falls below $40,000. That means no state general contractor license is needed for this work.
Getting a written price for your yard
A single call connects you with a pool demolition company serving your area. They'll ask a few questions about the pool and the yard, set up a visit, and hand you a price in writing.
Ready to get your yard back? Call now.
Get a crew to look at your yard
The ranges tell you what is usual. Once a crew sees your pool, the access, and the fill, they will give you a real written quote.