Pool removal in Alaska
Pool removal in Alaska starts with a local permit and an 811 call before digging; then a crew paid Alaska rates fills the pool in or takes it out.
- Concrete pool, filled in · 1–3 days
- $2,800–$11,100
- Concrete pool, taken out · 3–7 days
- $4,500–$17,800
US ranges from Angi, set for Alaska construction pay (BLS, May 2025); days from HomeAdvisor.
Pool removal cost calculator
What kind of pool is it?
Not sure? Touch the wall: soft and pressable is vinyl, slick and glossy is fiberglass, rough is concrete.
Last question
Fill it in, or take it all out?
Pool removal in Alaska runs from about $525 for an above-ground pool to $17,800 for a concrete pool taken all the way out.
The price depends on your kind of pool and on whether the crew buries it in place or hauls every piece away. Call now to reach a pool demolition company that works in your area. The crew will ask about your pool and yard, book a visit, and give you a written price. Your town may require a permit, and Alaska 811 needs to hear about the digging first.
Alaska pool removal costs by type
These figures begin with national numbers from Angi, then get adjusted upward for Alaska wages. Construction laborers here average $28.50 an hour, compared with $25.02 nationally (BLS, May 2025).
| Pool type | What the job involves | Alaska cost range |
|---|---|---|
| Above ground | Taken apart and hauled away | $525 to $2,775 |
| Concrete or gunite | Broken up and buried | $2,800 to $11,100 |
| Concrete or gunite | Fully removed | $4,500 to $17,800 |
| Fiberglass | Removed | $5,600 to $16,700 |
| Vinyl liner | Removed | $3,300 to $11,100 |
Where your job falls within a range depends on what the crew sees on site.
Fill-in versus full removal
If you own a concrete or gunite pool, there are 2 ways to go. Filling in leaves the pool in the ground, broken up and buried. Full removal takes the whole pool out first, and takes longer.
HomeAdvisor estimates 1 to 3 days of yard work for a fill in, versus 3 to 7 days for a full removal.
Your choice can come up again when you sell the house. Alaska's seller disclosure form, the document sellers complete for buyers, asks if you know about any buried debris or fill on the land. It also asks whether soil issues have caused the ground to sink, slide, or push upward.

Fill it in
$2,800–$11,100 in Alaska
- Time in the yard
- 1–3 days
- Build there later?
- Usually not
- Tell a buyer?
- Yes: the bottom of the pool stays buried. Show the permit and the compaction report.

Take it all out
$4,500–$17,800 in Alaska
- Time in the yard
- 3–7 days
- Build there later?
- Usually, once the town approves the packed fill
- Tell a buyer?
- Show the permit and the compaction report.
Do you need a permit?
Permit rules depend on where you live. In Anchorage's Building Safety Service Area, you need a permit from the building official before you tear down a structure, unless the code exempts the work (Municipality of Anchorage). Anchorage has no permit handout just for pools.
Anchorage also limits who may apply: only the property owner, or an agent holding the owner's written authorization, can obtain a demolition permit (Policy AG.08). When a contractor takes care of the paperwork on your behalf, you'll need to sign a letter giving them permission.
Juneau's demolition permit is free. The city sends an inspector to confirm the sewer, water, and electrical hookups are shut off safely.
Calling 811 before digging
Alaska law requires anyone digging to notify utility operators 2 to 15 working days before digging starts, or 10 to 20 working days in remote or unstaffed locations (Alaska 811).
This notice gives utility operators time to respond to a request to locate buried lines before digging starts. Utilities must respond within two working days, or within 10 working days in accessible remote locations, and always before digging begins. Factor that wait into your schedule for the work.
Is your contractor licensed for this job?
Alaska requires most contractors doing home improvement work to be licensed by the state (Alaska Division of Corporations). The bond is $25,000 for a general contractor and $10,000 for a specialty one.
Since 2015, Alaska handymen have been required to carry a General Contractor - Handyman license. It applies only to jobs totaling $10,000 or less, and liability insurance is required too. Many pool removals cost more than $10,000, so ask the company you call for a state license that covers your job.
How to get a firm quote for your property
- Pick your pool type with the tool on the home page. If it's concrete or gunite, say whether you want it filled in or fully removed.
- Check the Alaska range it gives you, so you have a sense of the going rate ahead of any visit.
- Tap the call button. Someone will ask a few questions about your pool and yard, set up a visit, and hand you a written quote.
A range is a good start, but only a written price tells you what your pool will really cost. Call now, and a local crew will set up a visit and give you that number in writing.
How this is worked out
We start with national prices and raise the labor part to match what Alaska crews earn. Labor is most of the cost of a pool removal, so higher local pay means higher prices here.
Get a crew to look at your yard
The ranges tell you what is usual. Once a crew sees your pool, the access, and the fill, they will give you a real written quote.